Works were carried out across a variety of locations, including hotels, health clubs, leisure centres, holiday parks, car parks, busy city-centre sites, and schools. Each installation was planned and delivered to suit the specific layout, operational requirements, and expected usage of the location.
Charging installations ranged from 7.4kW fast chargers to 300kW rapid units, providing flexible solutions to meet different charging demands. Our teams completed all civil and electrical works, including trenching ranging from short runs of a few metres to longer distances of up to 30 metres and over, across both soft ground such as soil and hard surfaces including tarmac. Where required, we installed electrical containment to safely route cabling either within buildings or across parking areas, along with full foundations and ducting as part of each installation. On completion, all areas were fully reinstated to their original condition, including tarmacking, block paving, turfing or grass seeding of excavated areas, line marking to parking bays, and full site clean-down where required.
Sites were energised using a combination of new power connections and existing electrical supplies, depending on local requirements. With projects completed across the length of the UK, we continue to deliver EV charging infrastructure on a consistent and repeat basis, supporting the ongoing growth in electric vehicles.